Geomorphic Responses to Check-Dam Removal on a Steep Mountain River in Taiwan
Abstract:
We collected the hourly discharge data of a Taipower gaging station located 6.8 km from the dam from 2010 to 2013 and conducted surveys of grain size distributions, cross-sectional and longitudinal profiles, and carried out repeat photography. One month after dam removal, a one-year event (Typhoon Meari) excavated a wedge of sediment from the impoundment. The knickpoint migrated to 200 m upstream from the dam and about 20,000 m3 of sediment had eroded from the reservoir. The profile remained pretty much unchanged until a year after in June 2012. Following a 20-year event (Typhoon Saola) in August 2012, the highest flow after dam removal to present, the channel significantly changed and the knickpoint migrated to 800 m upstream to the dam. The cumulative eroded amount increased to 150,000 m3, about three-thirds of the former impounded sediment. After a 5-year event (Typhoon Soulik) later on in July 2013, the knickpoint did not show much difference and the eroded amount of impounded sediment only increased 10,000 m3. However, the surveyed cross-sections showed obvious channel form changes and thalweg migration. It is likely that the entire bed was mobilized during the earlier high flows (Typhoon Saola), resulting in more easily mobilized bed material.
As many dams in Taiwan are located in steep mountainous area with highly variable hydrologic condition, we anticipate the observations will help enhancing future similar dam removal projects.
