We examine a process that consists of a sequence of batch steps in which each of the steps is composed of a number of individual units which can be of differing cycle times. We suggest a simple means of estimating:
a. equivalent cycle time of a step. b. the bottleneck step from (a). c. an upper bound of capacity of the overall batch operation from (b). d. the fraction of product produced by a given unit of the bottleneck step.
Itis assumed: 1. batches are all the same size. 2. 100% availability of equipment
Also, we distinguish between “process cycle time”, “step equivalent cycle time” and “cycle time of a unit”.