Preliminary Program subject to change
10C00 Scheduling
OverviewPlanning, Scheduling, and Supply Chain Optimization
Primary SponsorComputers in Operations and Information Processing (10c)

Chair

Kevin C. Furman
ExxonMobil Research and Engineering
Annandale, NJ 08801
Phone Number: 9087302281
Email: kevin.c.furman@exxonmobil.com

CoChair

Christos Maravelias
Assistant Professor
University of Wisconsin - Madison
1415 Engineering Drive
Madison, WI 53706
Phone Number: 608-265-9026
Fax Number: 608-262-5434
Email: christos@engr.wisc.edu
Optimal Scheduling of Multistage Batch Plants with Sequence Dependent Changeovers: a Comparative Study
Pedro Castro, Department of Process Modeling and Simulation, INETI, Lisbon, Portugal, Ignacio E. Grossmann, Chemical Engineering, Carnegie Mellon University, Pittsburgh, PA 15213 and Augusto Q. Novais, DMS, INETI, Lisbon, Portugal
An Improved Continuous-Time Model for Short-Term Scheduling of Continuous Processes: Rigorous Treatment of Storage Requirements
Munawar A. Shaik and Christodoulos A. Floudas, Department of Chemical Engineering, Princeton University, Engineering Quadrangle, Princeton, NJ 08544
Optimal Integration of Production Planning and Process Operation in Petrochemical Industry
Ru-Qiang Wang1, Xiao-Rong He2, Bing-Zhen Chen2 and Qiang Xu3, (1)Department of Chemical Engineering, Tsinghua University, Beijing, 100084, China, (2)Department of Chemical and Engineering, Tsinghua University, Beijing, 100084, China, (3)Department of Chemical Engineering, Lamar University, Beaumont, TX 77710
A Continuous Approach to Multi-Mode Resource Project Scheduling
Juan C. Zapata, Bri Mathias Hodge and Gintaras V. Reklaitis, Chemical Engineering, Purdue University, Forney Hall of Chemical Engineering 1137, 480 Stadium Mall Drive, West Lafayette, IN 47907-2100
Task Selection, Assignment and Sequencing in Multistage Batch Processes
Christos Maravelias1, Pradeep Prasad1 and Jeff Kelly2, (1)University of Wisconsin - Madison, 1415 Engineering Drive, Madison, WI 53706, (2)Honeywell Process Solutions, 300 Yorkland Blvd., Toronto, ON M2J 1S1, Canada
An Efficient Routine to Increase Robustness of Production Plans Embedded in an Integrated Multi-Scale Planning and Scheduling Approach
Hlynur Stefansson1, Pall Jensson2 and Nilay Shah1, (1)Centre for Process Systems Engineering, Imperial College London, London SW7 2AZ, London, United Kingdom, (2)Faculty of Engineering, University of Iceland, Reykjavik, 105, Iceland

Computing and Systems Technology Division