Wednesday, November 10, 2010: 4:30 PM
Deer Valley I (Marriott Downtown)
There are many circumstances that lead to shutting down of oil pipelines for operational or emergency reasons in locations with ambient temperatures below the wax appearance temperature.Under these static conditions, paraffinic waxes in crude oils start to precipitate and form gels. Restarting the gelled pipeline, and eventually clearing the gel, requires the application of a pressure upstream of the gel that gives rise to a shear stress that exceeds the gel yield stress value.Pressure profile measurements and particle imaging velocimetry (PIV) experiments were performed both during gelation and after a sudden application of the restart pressure on a transparent pipeline containing a model waxy oil with measured rheological properties.
See more of this Session: Chemistry, Thermodynamics and Multiphase Flow of Complex Fluids Related to Flow Assurance II
See more of this Group/Topical: Topical D: Chemical Engineering in Oil and Gas Production and Other Complex Subsurface Processes
See more of this Group/Topical: Topical D: Chemical Engineering in Oil and Gas Production and Other Complex Subsurface Processes
![[ Visit Client Website ]](images/banner.gif)