A full asset integrated model is built using typical industry known commercial simulator packages for each individual subsystem and field conditions, the integrated model includes steady state models for Reservoirs, Wells, Production and Injection Network and Processing Facilities. A platform which orchestrates data connectivity and integration while allowing subsystem applications to maintain their dependency in thermodynamic properties and equation of state solving is utilized for transferring data and controlling variables within the subsystems. Data from a major capital project at early stages of development was utilized to pilot test the technique and stress testing of consistency of forecast production across the subsystems, whole asset impact due to a change in an individual subsystem such as reservoir uncertainties, well placement and scheduling, surface network operating conditions, and individual subsystem constraints.
The integrated multi-field network model provided realistic optimal operating conditions and long-term production forecasts of oil production, sales gas and water injection requirements by incorporating the physics at appropriate levels to ensure higher accuracies than discrete models.
Integrated asset modelling utilizes information consistently across the whole asset and includes subsystem interdependencies impact on overall asset steady state operating conditions. Integrated modelling allows independent teams of facilities engineers and reservoir engineers to collaborate holistically while maintaining specific experts needs and resources.
The integrated model technique offers a novel and versatile capability of evaluating diverse operational scenarios to find optimal settings for short-term and the long-term asset production needs.
See more of this Group/Topical: General Submissions
