In 2004 and 2005, U.S. Army Corps of Engineers, Seattle District, conducted a field investigation that combined multiple investigation and analytical methods to further characterize low-level TCE plumes in fractured basalt aquifers at a Superfund site (former Larson Air Force Base in Moses Lake, Washington). The field plan was developed using systematic planning to create a dynamically-structured strategy for the field work to progress in a way to best meet project objectives based on an evolving conceptual site model. The plan was designed to allow the project team to make real-time decisions during field work to complete the remedial investigation phase of work and provide remaining necessary information for a feasibility study. The dynamic approach employed by the project team was dependent upon a detailed management plan (describing investigation methodologies, rationales, and sequencing), multi-discipline field and office teams with a mix of experience and expertise, partnering with regulators, traditional and innovative field investigation methods (drilling: air rotary, sonic, enhanced CPT; sampling: in-situ drilling samples, passive diffusion bag samplers, low-flow sampling), fixed and field analytical techniques (quick-turn fixed laboratory and on-site Direct Sensing Ion-Trap Mass Spectrometry), and progressive electronic data management (SEDD deliverables, web-based data tables and interactive web formats for coordination between field team, contractors, and in-house USACE and EPA teams).
See more of #137 - Innovative Environmental Management Procedures - Posters (TD003)
See more of Topical D: Innovative Environmental Management Procedures
See more of The 2006 Spring National Meeting