This scenario can be easily simulated in steady-state mode because the pressure relief setting is known by design constraints. However, dynamic simulation of the LNG refrigeration circuits has shown that it is possible to reduce the amount of refrigerant flared or eliminate it altogether. The key to this scenario is what is happening before the relief valves open and how the plant reacts to the pressure buildup. An interesting option is to bogdown the gas turbine and helper motor that drives the compressors and trip them on low speed before the PSV to flare reaches its set pressure.
The gas turbine's maximum available power can be reached faster by increasing the mass flowrate through the compressor stages, so that the compressors demand more power. The additional mass flowrate can be achieved by opening either the existing anti-surge control (ASC) valves or additional valves (e.g. a Recycle PSV) if they exist in the plant. When the compressor power demand reaches the gas turbine's maximum available power, the turbine reduces speed in order to maintain a power balance between itself and the compressors. In turn, this lower speed reduces the head achieved by the compressor and causes a maximum in the discharge pressure. The speed reduction also reduces the maximum available power and the gas turbine continues to reduce speed until it trips on low speed.
The gas turbine's trip could remove the refrigerant compressor blocked discharge case as the flare sizing case, allowing the flare and its header to be sized to a less severe scenario leading to important economic savings. This paper will examine this effect on a propane refrigeration circuit of a typical LNG C3/MR plant.
See more of #26 - LNG I - Plant & Operation (T6000)
See more of Topical 6: 6th Natural Gas Utilization
See more of The 2006 Spring National Meeting