In spite of many technical challenges during the design development of this biggest terminal, the terminal has achieved high standard of reliability and well optimized LNG regasification. The success of the project was accomplished by relentless practical design improvements and value improving practices by the engineering company with the support of the terminal operations.
This paper discusses practical optimization for the following issues in detail: Ć Optimization of vaporization with the unfavorable site condition (low seawater temperature in winter) Ć Operation of two different types of storage tanks (underground and above ground tanks) Ć Dynamic operation of double berth system Ć Safe tie-in under the operation conditions Ć Past and future expansion plan