Transient Flow Analysis in LNG Regasification Terminal Design Safety Brett Wink and Stephen Marcum, Aker Kvaerner, 3600 Briar Park Drive, Houston, TX 77042 |
Gas Interchangeability – Quality Issues and Solutions for US LNG Terminals Kamal C. Shah, Aker Kvaerner, 3600 Briar Park Drive, Houston, TX 77478 |
Floating Storage and Regasification Concepts Using the LNG Smart Air Vaporization Technology Brad S. Hubbard, Midstream Business Unit, Mustang Engineering, 16001 Park Ten Place, Houston, TX 77084, Randy Sharp, Process Engineer, Mustang Engineering, 16001 Park Ten Place, Houston, TX 77084, Ned Baudat, Project Director, Mustang Engineering, 16001 Park Ten Place, Houston, TX 77084 and Scott Worthington, V.P. Midstream Business Unit, Mustang Engineering, 16001 Park Ten Place, Houston, TX 77084 |
SIMAR Applications 1: Evaluating Expander-Based C2+ Recovery in Gas Processing Justin Trinter and Stanley Huang, Chevron Energy Trechnology Company, 1500 Louisiana Street, Houston, TX 77002 |
SIMAR Application 2: Optimal Design of Expander-Based C2+ Recovery in Gas Processing Christopher McMullen and Stanley Huang, Chevron Energy Technology Company, 1500 Louisiana Street, Houston, TX 77002 |
LNG Expert : the Latest Evolution in LNG Storage Tank Management Dominik T. Uznanski, Gaz de France, Direction de la Recherche, 361 avenue du Président Wilson, BP 33, 93211 Saint Denis La Plaine Cedex, France and Pieter Versluijs, Commercial, Whessoe S.A., rue de Bitche, Calais, 62100, France |
|