Due to Heavy Crude characteristics, LOA formation well above 200 ppm is expected when running the outlet of the heaters around 374 C (design condition) and was not considered in design either. Some other tests indicated presence of NH3 in the formation water in the crude, and evolution of H2S in more than 50 ppm in the Overhead water.
New operating conditions were set at 135 C (min top temperature), top P/A return temperature of min 127 C, and continuous wash water injection to keep overhead condensers clean. The column will be monitored and gamma-scanned frequently until next T/A to follow up the packing conditions when operating at these conditions.