Jonathan Worstell, Hoder, Shell Global Solutions US, 3333 Highway 6 South, Room CP-109, Houston, TX 77082 and John H. Worstell, Engineering and Construction, TST Infrastructure LLC, 61 Inverness Drive East, Suite 100, Englewood, CO 80112.
Since the mid-1950's, many methods have been devised and proposed for prioritizing technical, engineering projects. This talk presents an overview of these methods and discusses the strengths and weaknesses of each method. This talk also discusses the strengths and weaknesses of the currently preferred method.