351380 Extending Furnace Run Length By Optimizing Decoking
351380 Extending Furnace Run Length By Optimizing Decoking
Tuesday, April 1, 2014: 8:30 AM
Eglinton Winton (Hilton New Orleans Riverside)
In the Ethylene manufacturing process, coke deposited in the radiant coils and Transfer Line Exchangers (TLEs) during normal operation is removed periodically by decoking the furnaces using a mixture of steam and air. There is a significant variation in operating parameters adopted by different plants for decoking. These are often either too conservative or aggressive, leading to production loss from increased off-stream time, TLE limitation and deterioration in coil life. This paper describes how the decoking procedure was modified based on furnace and TLE operating conditions and the decoking steps changed to obtain the best possible Ethylene yield, without adversely impacting coil life and TLE performance. Furnace run length was more than doubled and production significantly increased.
See more of this Session: Experimental, Theoretical and Numerical Analysis of Transport Processes in Flow Reactors
See more of this Group/Topical: Topical 5: Emerging Technologies in Clean Energy for the Twenty-First Century
See more of this Group/Topical: Topical 5: Emerging Technologies in Clean Energy for the Twenty-First Century

Google
Yelp
Facebook
Twitter
ChEnected