479886 Gaining Insights into the Fouling Rates of Delayed Coker Heaters

Wednesday, March 29, 2017: 3:30 PM
304B (Henry B. Gonzalez Convention Center)
Robert Tufts, BRSI Inc., Canada, AB, Canada

Gaining Insights into the Fouling Rates of Delayed Coker Heaters

For most refiners operating Delayed Coking Units, one of the main issues negatively impacting the unit operating margin is lost production due to heater fouling. In the extreme case of a process upset, a Coker Heater can foul in a matter of days. A typical design basis for a new unit is a ten to twelve month run length before a shut down for decoking is required. More commonly, run lengths of four to eight months between decoking shut downs can be expected.

Developing a detailed understanding of the current heater operation and fouling rates is a critical first step when initiating a project to optimize the operation of the Delayed Coking unit. From this analysis, the impact that a change in the unit operation will have on future heater coking rates can be made and the results factored into the overall project economic benefit.

The main factors influencing Delayed Coker Heater fouling rates are:

·         Operating severity relative to the heater design basis

·         Feedstock properties

·         Radiant box firing characteristics

In most cases, the results of an accurate process simulation of the fired heater is sufficient to evaluate base coking rates and determine the root cause of accelerated heater fouling .  In some cases, due to inherent limitations of available general purpose heater rating programs, computational fluid dynamic modeling may also be required to develop a full understanding of the heater operation.

This paper will review typical heater design standards and how the identified factors influence heater fouling rates before discussing the role of simulation modeling in evaluating a delayed coker heater operation.

 


Extended Abstract: File Uploaded