To this extent, Gexcon has evaluated traditional congestion parameters such as volume blockage ratio, surface area to volume ratio and packing density as indicators of predicted overpressure as they are commonly used with both detailed and simple tools for explosion siting studies. On their own, these parameters have not proven reliable indicators of predicted overpressure and makes assessing the amount of congestion that needs to be added to early design phase models challenging. This study will focus on evaluating alternative ways of quantifying congestion, such as special obstruction density gradients in order to evaluate combustion and eddy/turbulence decay downstream of obstructed areas. With these alternative parameters, we have further refined our anticipated congestion method (ACM) for petrochemical facilities for accurate predictions of explosion consequences with early design phase models (concept or FEED phase). This methodology will define what levels of anticipated congestion are necessary to supplement CAD models in early design phase to ensure accurate assessment of explosion hazards.
This paper will summarize the findings of our alternative congestion parameter analysis and include recommendations for required congestion level for supplementing early phase designs.
See more of this Group/Topical: Global Congress on Process Safety
