The hazard scenario and consequence modeling case study in this paper was based on a large continuous reactor unit operation that was physically within a high length to width ratio congestion area. The potential for overpressure and resulting leak scenario was identified during the PHA/LOPA team meetings. The case study was based on this credible hazard scenario that involved a potential decomposition reaction with resulting high pressure and rupture of connecting reactor piping. The harmful event involved the rupture of a large flammable liquid feed line and vapor line from a recycle compressor.
With these results, the owner identified a need to relocate portable buildings to a safe location or require portable buildings designed for occupancy within the 0.6 or 0.9 psi overpressure radius to be of a design to protect the occupants. The authors will compare the portable building siting outcome of the three modeling methods, and substantiate the value of taking the escalating approach taken in the case study.
See more of this Group/Topical: Global Congress on Process Safety