Optimization of Monoclonal Antibody Production Using Process Simulation and Scheduling Tools
Demetri P. Petrides, INTELLIGEN, INC., 2326 Morse Avenue, Scotch Plains, NJ 07076 and Charles Siletti, INTELLIGEN, INC., 700 Walton Ave., Mount Laurel, NJ 08054

The new generation of monoclonal antibodies that are required in large quantities (hundreds of kilograms per year) present a number of manufacturing challenges to the biotech industry. Such products typically require facilities with multiple upstream and downstream suites. Furthermore, such biopharmaceuticals are often produced in multi-product manufacturing facilities. In such environments, the multiple production lines interact with each other through sharing of labor, utilities (e.g., steam, purified water), auxiliary equipment (e.g., CIP skids), buffer preparation tanks, etc. Occasionally, they also share rooms and other work areas. Sharing of resources, however, leads to scheduling bottlenecks and headaches that limit the throughput of the entire facility. Our experience in using process modeling and scheduling tools to improve the design of new biopharmaceutical facilities and the operation of existing ones will be presented using an industrial case study.

Extended Abstract Status: Not Uploaded

Poster Session: Pharmaceutical Technology

The Preliminary Program for 2005 Annual Meeting (Cincinnati, OH)