A Fast Method for Developing Accurate Scoping and Screening Cost Estimates for Pilot Plants

Richard Palluzi, Pilot Plant and Laboratory Engineering Section, ExxonMobil Research and Engineering Co, Annandale, NJ

There is often a need to develop scoping or screening estimates for pilot plant construction when little or no design information is available. While a variety of methods are commonly used such as using costs from “similar” units, asking experienced personnel to “quesstimate” a fast cost or simply guessing the accuracy of such estimates have been a continual source of problems in the industry. Too fast an estimate often produces gross errors; waiting for the necessary information and spending the time and effort to produce a realistic estimate is often too time consuming.

This talk will focus on a method ExxonMobil Research and Engineering has used successfully. It is based on maintaining a simple database of pilot plant costs and using this to access new pilot plants against the database in three fairly simple areas: size, complexity and constructability. Using fairly broad guidelines to place he proposed unit in one of 3 to 4 broad classes allows the estimator to use the average costs in the database to quickly and accurately produce a valid scoping or screening estimate.

The talk will present the method, explain the data required to make it work and offer guidelines for using it to make accurate estimates in a very brief time. A discussion of when the method will not work well is also included.