With a lack of industry standardization on minimum requirements of how consequence modeling calculations should be performed „Ÿ QRA results for a single facility or project may vary to a great extent, at times by many orders of magnitude, from one study to another depending on the consequence analysis features and limitations. A common misconception is that making a probability error, or using different probability data sets, has the same effect on the final QRA results as making the same order of magnitude error in the consequence modeling portion of the QRA calculations. Nothing can be far from the truth. This paper illustrates the importance of choosing the proper consequence modeling tools in shaping QRA results: in essence the difference between a project "Go" or "No Go", and of millions of dollars at stake.