This presentation will highlight a number of innovative revamp options that expand the processing capabilities of an existing CCR Platforming unit at a fraction of the cost of traditional options. These revamp options include:
o Alternative catalyst solutions to meet revamp objectives without equipment modifications
o Reactor bypasses as a cost effective means to debottleneck key reactor circuit constraints
o Auxiliary reactor section heaters connected in parallel to existing heaters and constructed primarily before the implementation turnaround
o Radiant followed by convective heater design to avoid costly turnaround scope modifications to an existing reactor section heater
A case study showing how a refiner was able to revamp an existing CCR Platforming unit to achieve a 90% capacity increase above name plate utilizing revamp innovations will also be described.